Reference pipe jacking

Project

Hangenham, Isar-Querung im Microtunneling-Verfahren

Client

Open Grid Europe

Order volume Epping

€ 4.419.000,00 net

Construction period

2018

Scope of services

Construction of a siphon

950m pipe jacking DN 2000 full-face Mixshield AVND in a single drive

Challenges

Pipe jacking at great depth (> 48,5 m)

Curved alignment: minimum radius R = 2000 m

Gradient 10%

Underpassing the Isar, Goldach, and Mosach rivers

Underpassing the existing street Rudfinger Straße

Geology

Gravel, sand, clay, groundwater