Referenz Rohrvortrieb

Projekt

Dresden Industriesammler Nord BA 2.1

Bauherr

Stadtentwässerung Dresden

Auftragsvolumen Epping

2.667.700,00 € net

Bauzeit

2024-2025

Leistungsumfang

990 m pipe jacking DN 1600 partial-face (480 m + 510 m)

Depth up to 12 m

Herausforderungen

Curved alignment with radius of R = 473 m

Urban alignment

Using the PNN method for UXO detection

Geologie

Sand

  • Next ProjectConstruction of the sewer along the upper and middle reaches of the River Berne (project section 5)