Reference pipe jacking

Project

Construction of the sewer along the upper and middle reaches of the River Berne (project section 5)

Client

Emschergenossenschaft Essen

Order volume Epping

€ 12.365.000,00 net

Construction period

2019-2022

Scope of service

450 m pipe jacking DN 2000 full-face Mixshield AVND in a single drive

380 m pipe jacking DN 2800 partial face under compressed air

89 m pipe jacking DN 2400 partial face under compressed air

1.130 m pipe jacking DN 2000 partial face under compressed air

1.122 m pipe jacking DN 1600 partial face under compressed air

Challenges

Urban alignment

Overpassing subway tunnel

Underpassing Deutsche Bahn railway tracks

Underpassing buildings

Underpassing the Berne river

curved alignments with radii of R = 480/500 m, R = 480 m, and R = 450 m

pipe jacking in groundwater with water pressure up to 1.5 bar

partial-face drives using the PNN method for UXO detection

Geology

Marl, sand, silt, groundwater